Have you been thinking about remodeling your bathroom? Our team at Joseph Kitchen and Bath has put together everything you need to know about a Bathroom Renovation in Toronto in this guide! Follow along to read the advantages of a bathroom renovation, how long it takes, and what the phases of the project look like.
What Are the Advantages of a Bathroom Renovation?
There are many reasons why homeowners decide to renovate their bathrooms. Renovating a bathroom can help repair old problems, like plumbing leaks or rotted floors, it can significantly increase a home’s value, and it can give the homeowner a chance to revamp the layout and design the area how they would like it. A bathroom renovation is well worth it in the end!
How Long Does a Bathroom Renovation Take?
Each bathroom project is unique and there is not necessarily a timeline that can fit every project. The scope of a bathroom renovation can vary based on what the homeowner wants to be completed and how large the bathroom is. In saying this, an average of 20-23 days is typically needed to complete this type of renovation.
Phases & Time Frame of a Bathroom Renovation
There are three phases of a bathroom renovation, they include: pre-construction, during construction, and post-construction.
Phase 1: Pre-Construction
First up, comes the planning. In this phase, you will need to find a qualified and experienced contractor who is willing to take on your project. During this time, you should schedule site visits with them so they can view your space and hear about what you want. After you have found a contractor, you will need to sign the contract, obtain permits, and start picking out materials. This phase generally takes 6-8 weeks for permit approval.
Phase 2: During Construction
Now, you enter the second phase where the work begins. Contractors will begin working on the space by cleaning out the area. Then base work like plumbing and electrical will then take place. Next will come flooring and then installing the toilet, vanity, sink, bath, etc. Finally, the finishing touches such as decorating and cleaning will take place. This phase generally takes about 19-41 days depending on the scope of the project.
Phase 3: Post Construction
Finally, comes post-construction. Congratulations, you now have a functional and renovated bathroom! Before you cut ties with the contractor, take a final walk-through with them to ensure everything is up to your standards. You will want to inspect their work and note any changes to be made. After the final inspection is complete, you can settle the contract, and enjoy your new space!
How We Can Help
When it comes to a bathroom or kitchen renovation in Toronto, our team at Joseph Kitchen and Bath is the right contractor to hire! Our team takes great pride in our work and we work with you to ensure that you are satisfied at the end of the project. To get a quote on your home renovation project, be sure to call us at (905) 707-7756 today!